Encore crew setting up an auger boring machine with steel casing in a bore pit
Steel & Composite Lines

Steel & Composite Lines in the Permian Basin

Overview

We take a project from right-of-way prep through commissioning under one contract, so you're coordinating with one crew, not stitching together a chain of subs.

Whether it's a single tie-in or a field-wide build, the same crews who broke ground close it out.

Capabilities

What this scope includes

System types

  • Gas gathering & transmission
  • Crude oil
  • Produced water

Materials

  • Carbon steel
  • Composite

Construction methods

  • Rock & dirt trenching
  • Road bores
  • Pipeline insertions
  • Pipeline replacements
  • Pipeline padding

Process

  • ROW prep & clearing
  • Hydrostatic testing
  • Tie-ins
  • Commissioning

Delivery

  • Single-contract accountability from first joint to final walk-down
Why Encore

Why operators choose us for this work

01

Self-performed crews. The people who bid it are the people who build it.

02

Permian-specific. We know this basin's soil, ROW conditions, and operator standards.

03

25+ field crews, steel, poly & composite. 247 workers credentialed in EWN. Schedule certainty, not a labor-broker scramble.

BY THE NUMBERS

200+
miles of pipe laid in the last 12 months
25+
field crews: steel, poly & composite
80+
companies under MSA, upstream & midstream
95%+
of the heavy iron on our jobs is our own

Figures from Encore's 2026 company sheet.

WHERE WE WORK

We mobilize from our yard at 6101 E I-20 in Midland, Texas, and work exclusively in the Permian Basin: the Midland Basin and both the Texas and New Mexico sides of the Delaware Basin. This basin is all we do, so our crews already know its caliche, its rock, its lease roads and its operators' standards.

FREQUENTLY ASKED QUESTIONS

What kinds of steel and composite lines does Encore build?

Gas gathering and transmission, crude oil and produced water lines, from right-of-way prep through commissioning.

When does composite make sense instead of steel?

Composite and spoolable pipe resist corrosion and install quickly from reels. Steel remains the choice for many high-pressure and large-diameter lines. The right answer depends on pressure, temperature, product and your spec, and we build both.

Can you bore under roads?

Yes. Road bores are part of our construction scope, along with rock and dirt trenching, padding, insertions and replacements.

Can you handle rock?

Yes. We trench rock and dirt, and 95%+ of the heavy iron on our jobs is our own, so the schedule isn't waiting on a rental yard.

How are lines tested before turnover?

Lines are hydrostatically tested, tied in and commissioned by the same crews that built them, with single-contract accountability from first joint to final walk-down.

Tell us what you need built.

Tell us what you need built. We'll bid it like the crew that has to build it, because we are.

Request a Bid