One PO. One Schedule. We Can Source the Pipe.
Let the contractor who's installing it buy it. We source pipe, fittings and valves, and match delivery to the build schedule.
Buying pipe yourself means another vendor, another schedule, and a crew standing around when a truck is late. When we procure, materials and installation sit with one contractor, so we're accountable for the pipe showing up when the crew needs it.
We source poly, steel and composite pipe plus the fittings, valves and materials that go with them, to your specs and your approved manufacturers.
What this scope includes
Materials
- HDPE poly pipe and fittings
- Carbon steel pipe
- Composite and spoolable pipe
- Valves, flanges and fittings
Specs
- Built to your specifications and approved-manufacturer list
- Mill and material documentation passed through
Logistics
- Delivery sequenced to the construction schedule
- Laydown and stringing
- Receiving and inspection
Commercial
- Materials and install on one PO or split, your choice
Why operators choose us for this work
One point of accountability. If the pipe's late, it's our problem, not yours.
Schedule-matched. Deliveries timed to the crew, not dumped on the lease.
Your specs. Your approved manufacturers, with paperwork included.
BY THE NUMBERS
- 200+
- miles of pipe laid in the last 12 months
- 25+
- field crews: steel, poly & composite
- 80+
- companies under MSA, upstream & midstream
- 95%+
- of the heavy iron on our jobs is our own
Figures from Encore's 2026 company sheet.
WHERE WE WORK
We mobilize from our yard at 6101 E I-20 in Midland, Texas, and work exclusively in the Permian Basin: the Midland Basin and both the Texas and New Mexico sides of the Delaware Basin. This basin is all we do, so our crews already know its caliche, its rock, its lease roads and its operators' standards.
FREQUENTLY ASKED QUESTIONS
Can Encore buy the pipe for our project?
Yes. We source poly, steel and composite pipe plus fittings, valves and flanges, so materials and installation sit with one contractor on one schedule.
Will you use our approved manufacturers?
Yes. We buy to your specifications and approved-manufacturer list, and pass through the mill and material documentation.
Can we buy some materials ourselves?
Yes. Materials and install can go on one PO or be split, your choice.
How is delivery handled?
Deliveries are sequenced to the construction schedule. We handle receiving and inspection, laydown and stringing, so pipe shows up when the crew needs it rather than sitting on the lease.
Why have the installer procure the pipe?
One point of accountability. If the pipe is late, it's our problem to solve, not a dispute between your vendor and your contractor.
Other work we self-perform
Want one contractor on the hook?
Send the spec and the schedule. We'll price the pipe and the install together or separately.